6.27.2025

Foundations are in and the floor is being poured. Leading the way for framing to begin and the building to take shape.

7.14.2025

.

Construction continues, with our drone capturing the framing process, the client was able to get a detailed 360 degree overhead view of the structure with videos, images, and 3D modeling.

7.24.2025

.

Exterior construction progresses quickly, with our third site visit capturing the extensive outer shell construction and roof preparation.